Skip to content
ScaffoldCoupler.com Request a quote

Scaffold couplers & clamps

Scaffold couplers and clamps, sourced from the Cangzhou forging and casting cluster.

Sourcing and export supply for scaffolding contractors, distributors and importers. Prepare your specification with the technical guides and send an enquiry: we select a factory in the cluster, check its documents, and quote you ourselves. Read how ordering works before requesting samples or a quotation.

Quick reference

Tube OD
48.3 mm (BS EN 39 / EN 74)
Coupler classes
EN 74-1 Class A/AA · Class B/BB
Legacy UK standard
BS 1139-2.2 (drop forged)
Right-angle type-test slip
Class A 10,0 kN · Class B 15,0 kN
Finishes
Hot-dip galvanised · electro-plated · painted
Manufacture
Drop forged · pressed steel · malleable cast

Load figures are type-test characteristic values from BS EN 74-1:2022+A1:2025 Table 8, not safe working loads. How to read them.

Couplers we supply

Full range →

Drop-forged couplers from a forging factory in Renqiu, Cangzhou. Photos supplied by the factory; price, MOQ and lead time are quoted for each enquiry.

Pile of assembled drop-forged scaffold couplers with bolts and nuts
Double and swivel couplers
Galvanised scaffold sleeve coupler marked BS1139 with two bolts
Sleeve coupler
Scaffold putlog coupler with a single flap and bolt
Putlog coupler
Rows of woven bags filled with couplers stacked in a warehouse
Packed at the factory

Browse by topic

  • Coupler Types

    Swivel, double / right-angle, sleeve, putlog, beam clamps and accessory couplers — what each does and where it is used.

  • Standards & Load Ratings

    BS 1139, EN 74 classes A/B, slip and failure loads, weights and dimensions, pressed vs drop-forged.

  • Tube & Fitting Systems

    How tube-and-clamp (US) / tube-and-fitting (UK) scaffolding goes together, and the names buyers use in each market.

How this site works

1 · Prepare the enquiry

Identify the coupler, standard edition, applicable type and class, quantity and destination. Add the documents and inspection arrangements you need so the open questions are visible from the start.

2 · We check and quote

We reply within two working days with any missing specification details and the next step. Before we quote, we check the selected factory's type-test report for the item and its export record. Factory relationships are still being built, so price, MOQ and lead time are quoted for each enquiry; there is no price list.

3 · You contract with us

We quote, sign the contract and arrange production and shipment; we do not manufacture. The export side of the business is being set up, so the contracting party and payment route for each order are confirmed in writing on the PI or contract before you pay. See how to order and the site terms.